2 line between bellevue and redmond is here! After nearly eight years since construction began, the highly anticipated sound transit 2 line connecting redmond and bellevue is finally ready to launch. The trains come by each station every.
And the t line opened service to hilltop in september 2023. The 2 line opened between south bellevue and redmond technology station the previous april; Starting may 10, travelers can hop on the link light rail from downtown bellevue and be in the heart of redmond in under 20 minutes, no car required.
Read more on the sound transit. When fully operational, the 2 line will run every 10 minutes from 5:30 a.m. This october, metro will launch the rapidride b line between bellevue and redmond. The 2 line starter line between south bellevue to redmond technology station opened on april 27, 2024!
Sound transit says the trip between redmond technology center near microsoft and bellevue downtown should take about 10 minutes. To 9:30 p.m., seven days a week, between south bellevue and downtown redmond. Sound transit's east link light rail line will extend 14 miles from downtown seattle to the overlake area in redmond, with 10 stations in mercer island, south bellevue, downtown bellevue,.