The 2 line opened between south bellevue and redmond technology station the previous april; The 2 line starter line between south bellevue to redmond technology station opened on april 27, 2024! The trains come by each station every.
And the t line opened service to hilltop in september 2023. Sound transit's east link light rail line will extend 14 miles from downtown seattle to the overlake area in redmond, with 10 stations in mercer island, south bellevue, downtown bellevue,. When fully operational, the 2 line will run every 10 minutes from 5:30 a.m.
To 9:30 p.m., seven days a week, between south bellevue and downtown redmond. Sound transit says the trip between redmond technology center near microsoft and bellevue downtown should take about 10 minutes. This october, metro will launch the rapidride b line between bellevue and redmond. Read more on the sound transit.
This new bus line will provide frequent, fast, and reliable service throughout the day via crossroads and. After nearly eight years since construction began, the highly anticipated sound transit 2 line connecting redmond and bellevue is finally ready to launch. 2 line between bellevue and redmond is here!